How Vertical Platform Lift can Save You Time, Stress, and Money.
For every footing, dig a hole 12 inches in diameter and below the frost line. Frost line may differ from location to region, and in the event the regional building authority approves the system, they’ll show you how deep the footings needs to be—on normal, expect to dig the holes no less than 30 inches deep.Installation is currently A part of t